PROJECT
Lisnaskea Recycling Centre Redevelopmen
CLIENT
Fermanagh and Omagh District Council
TIME FRAME
October 2022 – April 2023
PROJECT BRIEF
The project aimed to establish a functional and efficient workspace by carrying out a comprehensive site redevelopment. This included the demolition of existing structures, site levelling, construction of retaining walls, installation of a modular prefabricated office building, and integration of essential utilities and security systems. The initiative focused on delivering a well-designed and secure environment that adhered to contractual specifications and regulatory standards.

PROJECT KEY POINTS
- Demolition & Site Preparation: Removal of existing buildings, pipework and other identified structures.
- Structural Works: Construction of retaining walls and earthworks to achieve required site levels.
- Modular Office Installation: Prefabricated office building with associated services and foundations.
- Utility Connections: Installation of CCTV, water, sewage and power points.
- Drainage Systems: Foul and surface water drainage, flow control devices and interceptor implementation.
- Concrete & Foundations: Casting of concrete yards and necessary structural foundations.
- Site Furnishings & Security: Installation of lighting columns, barriers, bollards, fencing, gates and road markings.
- Fire & Security Systems: Implementation of fire detection, alarm systems and an intruder alarm system.
- Landscaping & Final Works: Topographic survey, landscaping, and final site clean-up.