PROJECT

Ballymena Showgrounds 3G Upgrade & Multi-Sports Games Area

CLIENT

Mid and East Antrim Borough Council

TIME FRAME

January – August 2025

PROJECT BRIEF

CivCo delivered a full redevelopment of the Ballymena Showgrounds Facility – upgrading from a 2G to 3G synthetic pitch system and transforming the Showgrounds into a UFEA Category 3, FIFA Quality and FIH Multi-Sport complaint venue.

  • Full Site Clearance – Removal of 2G carpet, rubber shock pad, infill and equipment, with responsible recycling and disposal.
  • Drainage & Base Protection – Jetting and CCTV inspection of drainage systems, with localised repairs and porosity checks.
  • Surface Preparation – Flatness and gradient tolerances corrected using approved self-levelling compounds.
  • Shock Pad Installation – 20mm closed-cell cross-linked Polyolefin foam pad, meeting ISO 1923 and EN 14808 standards.
  • 3G Synthetic Turf Installation – Dual-fibre tufted carpet with sand and SBR infill, meeting FIFA/FA guidelines.
  • Line Markings – Inlaid 11-a-side and 7-a-side football markings installed.
  • Technical Compliance – Independent UKAS-accredited testing pre and post handover, confirming performance standards.
  • Environmental Considerations – Use of recyclable materials, licensed waste disposal and a microplastic containment-aligned maintenance plan.
  • Performance Assurance – 15-year shock pad warranty, 5-year turf/workmanship warranty and scheduled maintenance visits.
Ballymena Showgrounds Pitch and MUGA Upgrade

PROJECT KEY POINTS

  • Removal & recycling of the old 2G surface
  • Drainage upgrades & base preparation
  • Installation of a high-performance 20mm shock pad & 3G synthetic turf
  • Inlaid line markings for multi sport purposes
  • Independent UKAS-accredited testing to international standards

Sustainability & Assurance

  • Recyclable turf & shock pad materials used
  • Waste and infill responsibly disposed of
  • Maintenance plan aligned with microplastic guidance
  • 15-year warranty (shock pad) & 5-year warranty (synthetic turf/workmanship)

PROJECT OUTCOME

Ballymena Showgrounds 3G Upgrade & Multi Sports Games Area was delivered on time, within budget and to internationally recognised standards.

The new 3G pitch provides a high-performance, multi-sport surface for football and other field sports.
–  Independent testing confirmed compliance with FIFA Quality and FIH Multi-Sport standards.
 – Sustainable materials and environmental management reduced waste and ensured responsible construction practices.
 – Long-term warranties and a detailed maintenance plan safeguard the facility’s durability and performance.

The completed project demonstrates CivCo’s capability to deliver technically complex, performance-tested and environmentally responsible sports infrastructure on time, to budget and specification.