PROJECT
Tullvar Landfill Capping
CLIENT
Mid Ulster District Council
TIME FRAME
January 2021 – July 2021
PROJECT BRIEF
CivCo was appointed to deliver capping and remediation works at Tullyvar Landfill Site, Aughnacloy, Co. Tyrone. The project involved the installation of a fully engineered capping system to control leachate and gas emissions, safeguard the surrounding environment and bring the former landfill into long-term compliance with environmental regulations. Works also included surface water management, drainage improvements and final landscaping to restore the site to a stable, compliant and sustainable condition.

PROJECT KEY POINTS
The completion of the capping works at Tullyvar marked a significant step in reducing the long-term environmental risks associated with the former landfill. By installing a secure and fully engineered capping system, CivCo ensured that this site now benefits from enhanced control of landfill gas and leachate, protecting both local ecosystems and nearby communities.
Alongside this, new drainage measures were introduced to manage surface water more effectively. These improvements transformed what had once been a disused site into a safe, compliant and sustainable landscape.
By combining technical expertise and careful planning, CivCo left a legacy of environmental compliance, providing long-term benefits to the natural ecosystem and communities surrounding Tullyvar.
Approach
Early engagement and planning with the client Mid Ulster District Council, regulators and environmental consultants to align on design, compliance and programme.
Comprehensive site investigations to inform the capping design and identify environmental sensitivities.
Phased construction sequencing to maintain safe operations and minimise environmental disruption.
Installation of engineered solutions, including capping layers, gas management, leachate control and drainage infrastructure.
Strict environmental and health & safety management throughout, ensuring compliance on a sensitive site.
Collaborative project management to keep the programme on track and deliver quality outcomes within regulatory requirements.
PROJECT OUTCOME
The capping and restoration of Tullyvar, a once busy landfill site, has transformed it into a safe, compliant and environmentally stable area.
- Delivery of a secure, fully engineered capping system, reducing long-term environmental risks.
- Enhanced control of gas and leachate, safeguarding local ecosystems and communities.
- Improved surface water management through new drainage infrastructure.
- Stabilisation of ground conditions and reduced risk of contamination.
- Transformation of a disused landfill into a safe, compliant and environmentally stable site.
- Clear demonstration of CivCo’s capability in delivering complex environmental infrastructure projects.
PROJECT SERVICES